Set the GMP basis before it becomes history.

The GMP-stage handoff settles one open basis question before the estimate narrative is issued.

How a GMP-stage review is framed. We build the brief around one decision, set the documents that control it side by side, and hand it to the person who owns the call. The brief below shows the shape of that handoff.

Illustrative brief. Composite example, not customer work.

Request a Demo
ChangeGuard / Illustrative stage brief02 / GMP

Decision desk / 02

GMP decision desk

Which exterior wall detail controls the allowance in the GMP estimate?

Stage
GMP
Decision gate
Before GMP issue
Project owner
Preconstruction manager
Record state
Open question

The source record

Permit drawing A-521 / Revision 4

The wall section adds a continuous secondary support angle at Level 3.

GMP estimate narrative / Section 6

The carried allowance describes the earlier wall section without the secondary support angle.

The review question

Confirm which wall detail forms the GMP basis.

We flag the conflict, draft the clarification, and leave final approval with the team.

Project team action

Record the decision at the gate.

Owner
Preconstruction manager
Timing
Before GMP issue
Action
The preconstruction manager settles the basis, then revises the estimate narrative or records the open qualification.
Record
Estimate narrative and open-items log

ChangeGuard work products are advisory and do not replace the judgment of the project team, designer, estimator, legal counsel, or other qualified professionals.

Bring the decision and deadline.

A demo starts with the stage question and the documents that control it.

Request a Demo