Decision desk / 01
Bid decision desk
Which addendum and electrical scope note control the feeder allowance carried in the bid?
The source record
Drawing E-401 / Addendum 03
The revised feeder note moves the connection point to the service yard.
Electrical bid scope / Section 2.4
The scope narrative still carries the connection point shown in the original bid issue.
The review question
Confirm the feeder basis before electrical quotes are leveled.
We flag the conflict, draft the clarification, and leave final approval with the team.
Project team action
Record the decision at the gate.
- Owner
- Lead estimator
- Timing
- Before quote leveling
- Action
- The estimator confirms the controlling instruction and updates the bid scope or clarification log.
- Record
- Bid scope and clarification log
ChangeGuard work products are advisory and do not replace the judgment of the project team, designer, estimator, legal counsel, or other qualified professionals.