Preconstruction document review for general contractors and construction managers

Keep bid and GMP decisions tied to the source.

ChangeGuard reviews the drawings, specifications, contracts, addenda, and trade scopes behind a bid or GMP decision together, and keeps review items tied to their source references.

What a review delivers

A written review of the documents behind your bid or GMP, tied to your decision date.

You name the bid or GMP decision and its date. A written proposal fixes the documents in scope, the work products, and the fee. The results go to the person who owns the call.

Why it matters. Before quote leveling, a conflict between two documents is still a question for the design team. After award, the same conflict can become a change order or a dispute over who carries the work.

Each engagement is offered only after a fit conversation and written scope.

Who it is for
Preconstruction leaders, estimators, and project managers at general contractors and construction managers.
What we review
The documents behind your bid or GMP decision, listed in the proposal.
Timing
Set in the written proposal, tied to your decision date.
Price
Quoted per engagement in the written proposal. The fee depends mostly on the size and condition of the document set. How pricing works

When to bring us in

Bid and GMP reviews are scoped by written proposal. Award, buyout, and change review are planned and not offered yet.

01 / Bid

Put the bid basis on the desk.

The bid-stage handoff centers on the documents and the decision the estimator names before quote leveling.

We build the brief around one decision, set the documents that control it side by side, and hand it to the person who owns the call.

Decision gate
Before quote leveling
Project owner
Lead estimator
Stage brief 01Bid

The decision

Which addendum and electrical scope note control the feeder allowance carried in the bid?

Drawing E-401 / Addendum 03

The revised feeder note moves the connection point to the service yard.

Electrical bid scope / Section 3.2

The scope narrative still carries the connection point shown in the original bid issue.

The review question

Confirm the feeder basis before electrical quotes are leveled.

Illustrative brief. Composite example, not customer work.

The operating problem

The decision is one moment. Its basis is scattered across the set.

A requirement can sit in a specification, a conflicting quantity on a drawing, and a missing responsibility in a trade scope. The review has to connect them before the commitment is made.

An unfinished commercial interior with exposed metal framing, concrete columns, ductwork, and conduit
Drawing to specification
An indicated assembly and its written requirement can carry different assumptions.
Contract to trade scope
Ownership, exclusions, and handoffs can depend on language outside the scope sheet.
Revision to decision
A later issue can change the basis the project team believed it had reviewed.

Illustrative review item

Two drawings, one panel, two ratings.

A useful work product keeps the issue, its source references, a draft question, and the next action together. This composite example does not use customer documents.

How to read this example

  1. Source references. The E-601 equipment schedule lists panel DP-1 with an 800A main; the E-501 single-line diagram shows a 600A main.
  2. The review item. What does not line up between them, in one sentence.
  3. Draft RFI. A draft question to the design team that cites both drawings.
  4. Recommended action. The next step, who owns it, and when it is due.
Review item 01Electrical / coordination

Drawing E-501 / single-line diagram

Single-line diagram: panel DP-1, 600A main.

Drawing E-601 / equipment schedule

Row DP-1

Distribution panel DP-1, 800A main.

Review item

DP-1 has an 800A main on the E-601 schedule and a 600A main on the E-501 single-line.

Both drawings describe the same panel, and electrical trade scope § 2.4 carries 600A. Quotes leveled against § 2.4 would price the smaller main; if the design team confirms 800A, the difference can come back after award as a change order request.

Draft RFI

E-601 schedules DP-1 with an 800A main; the E-501 single-line shows 600A. Please confirm the required main rating and revise the drawing that does not match.

Recommended action

Issue the RFI, confirm which main rating electrical bidders priced, and revise § 2.4 to the confirmed rating before quote leveling.

Owner

Project manager / electrical estimator

Timing

Before quote leveling

How it starts

Start with a real decision.

A first call covers three questions. If a review fits, we send a written proposal naming the documents in scope, the work products, the fee, and a target delivery date. Work starts after you accept it.

  1. 01

    Which decision?

    Name the bid or GMP question the team needs to settle, and when it is due.

  2. 02

    Which documents?

    Identify the drawings, specifications, contracts, trade scopes, and known revisions in hand.

  3. 03

    Which handoff?

    Define what the project team would need to review, clarify, or carry into the next meeting.

Standards & data handling

Clear boundaries. Traceable work.

A defensible review standard identifies the document basis, preserves source references, states limitations, and keeps project-team judgment central.

Read the proposed working standard

Software in development

The review comes first. The workspace is being designed around it.

A ChangeGuard review is scoped in a written proposal. Separately, we are designing a workspace that would keep each item, its source references, the project team’s response, and later revisions together. The workspace page shows design targets with illustrative data.

Put the next decision in view.

Tell us the decision, the deadline, and the documents in hand. We will confirm fit and next steps, and if a review fits, send a written proposal.